Impact assessments Yggdrasil (formely NOAKA)

The purpose of the impact assessments (IAs) in the Yggdrasil area is to account for the effects that the development and its operation could have on the environment, including cultural monuments and cultural environment, natural resources and society.

The Yggdrasil IAs have been prepared to ensure these effects have been taken into account in the decision-making process. Below is all documentation related to the Yggdrasil IA process.

Yggdrasil (formerly NOAKA), consists of the Hugin, Fulla and Munin licence groups (formely NOA, Fulla and Krafla), and the area is located between Alvheim and Oseberg. The area is home to a number of discoveries and contains a total of around 650 million barrels of oil equivalent. Aker BP is operator of the Yggdrasil area, with Equinor and PGNIG Upstream Norway as licence partners.

The documents below are written in Norwegian.

Program for konsekvensutredning Hugin og Fulla

  • PDF – 378 KB
    Følgebrev NOA Fulla forslag til program for konsekvensutredning
    21.03.2023 Download
  • PDF – 2.67 MB
    NOA Fulla forslag til program for konsekvensutredning
    21.03.2023 Download
  • PDF – 7.88 MB
    Høringsuttalelser_forslag til program for KU for utbygging og drift av NOA Fulla
    21.03.2023 Download
  • PDF – 684 KB
    Anmodning om fastsettelse av program for KU for NOA Fulla – Aker BPs svar på høringsuttalelser
    21.03.2023 Download

Konsekvensutredning Hugin og Fulla

  • PDF – 464 KB
    Følgebrev NOA Fulla konsekvensutredning
    21.03.2023 Download
  • PDF – 8.27 MB
    NOA Fulla konsekvensutredning
    21.03.2023 Download
  • PDF – 1.45 MB
    Høringsuttalelser til konsekvensutredning
    21.03.2023 Download
  • PDF – 802 KB
    Oppsummering av høringsuttalelser til NOA Fulla KU og tilsvar
    21.03.2023 Download
  • PDF – 796 KB
    Sammendrag oppdaterte BAT-vurderinger
    21.03.2023 Download

Program for konsekvensutredning Munin

  • PDF – 1.01 MB
    Høringsbrev Krafla 11. oktober 2021
    22.03.2023 Download
  • PDF – 4.32 MB
    Krafla KU-forslag til utredningsprogram
    22.03.2023 Download
  • PDF – 1.02 MB
    Rettelse elektromagnetiske felt
    22.03.2023 Download
  • PDF – 4.22 MB
    Krafla KU-program høringsuttalelser
    22.03.2023 Download
  • PDF – 904 KB
    Anmodning om fastsettelse av utredningsprogram Krafla feb 2022
    22.03.2023 Download
  • PDF – 1.84 MB
    Krafla oppsummering av høringsuttalelser til KU-program februar 2022
    22.03.2023 Download

Konsekvensutredning Munin

  • PDF – 879 KB
    Høringsbrev KU Krafla juni 2022
    22.03.2023 Download
  • PDF – 9.9 MB
    Krafla KU
    22.03.2023 Download
  • PDF – 67.7 KB
    Rettelse til Krafla KU – utslipp av hypokloritt
    22.03.2023 Download
  • PDF – 2.16 MB
    Krafla KU høringsuttalelser
    22.03.2023 Download
  • PDF – 3.15 MB
    Oppsummering av høringsuttalelser til KU og tilsvar
    22.03.2023 Download
  • PDF – 934 KB
    Høringsbrev tilleggsutredning til Krafla KU
    22.03.2023 Download
  • PDF – 855 KB
    Tilleggsutredning oljeeksport via Grane oljerør
    22.03.2023 Download